You have a railroad in your head. Dream Division gets it out where you and everyone else can see it: from an empty room to pictures of the finished layout, and every one of them buildable.
Founding members get the first release in January 2027.$99 for the first year, founder's price.Runs in the browser on a Mac, PC or iPad.

Walk the room once with an iPhone, or type the sizes. Doors, windows, the furnace and the post all land on the plan, so the railroad is fitted to the room you actually have.
A published plan, a photo of graph paper, a drawing from a design session. Dream Division reads the track, the sections and the names, fits them to the measured room, and shows you what it was sure of and what it guessed.
Real parts from the catalog, laid on the plan with the grades and clearances worked out. The checks run as you work and speak in plain words: which curve is too tight, which grade is too steep, what is out of reach from the aisle.


Then the part no other tool does.
Era. Location. Industries. Key scenic elements.
A partner that listens. You say what the railroad is and when it runs; it says back what it heard and asks one question at a time. It never lays track and never moves anything on your plan. Your words stay with the railroad and feed the pictures.

Pin the scenes you care about. Each picture is drawn from the plan itself and from what you told the partner, so the trestle stands where your trestle is and the mill sits at the end of your branch.


The curved trestle over the gorge, the main line coming out of the tunnel behind it.
Rendered from the Blue Ridge Division plan. Highlight 1.

The sawmill at the end of the branch, log piles by the spur, company houses up the hill.
Rendered from the Blue Ridge Division plan. Highlight 2.

The turntable and its bridge, the stall tracks running into the roundhouse, the lead coming up from the yard ladder.
A closer view made from the yard picture, which was rendered from the plan. Highlight 3.

Five tracks running to their bumpers at the aisle, the ladder, the turntable and roundhouse beyond.
Rendered from the Blue Ridge Division plan. Highlight 4.
Three more tools come to founding members through 2027, each one built from the same plan.
Sections, legs and risers drawn from the plan, with a cut list and shop drawings you can take to the lumber yard.
What the railroad costs in track, turnouts, lumber and structures, and which part to build first so trains run early.
Curves, grades and clearances checked against the engines and cars you actually own, before you cut a single board.
The first release arrives in January 2027. Founding members are in from the first day, and get every feature as it lands through the year.
$99 for the first yearFounder's price. Give it as a gift: the recipient gets a code and a founder's card.
Dream Division runs in the browser, so it works on a Mac, a PC or an iPad with nothing to install.